Coleman Grill- Consumer

PROBLEM: Set up time for the customer or the assembly point in the "Big Box" store exceed 2 hours. Coleman asked PCDworks to examine the product to try to reduce assembly time and reduce the manufacturing complexity.

RESULTS: PCDworks design efforts reduced assembly time to less than 1/2 hour, reduced the shipping cube by 20% and reduced manufacturing costs by 4%.